Monday, August 31, 2009

End of August

Black Fire” Status.

Well I will not have a finalized score and recording for release before the end of August, I can say that all of the music has been “composed” and in that narrow sense the piece is finished, but not ready for release. I am still working through all of the details, things like dynamic markings, phrase markings and other such things. Then I will need to proof all of the parts before the piece is ready to be published. And then we can move onto making a recording. So I am happy with the progress I have made this month as the “notes” are done.


Ursus Demens

Monday, August 24, 2009

Black Fire progress

While I have not posted in a while, progress on "Black Five" continues to move forward each day. I do not know if I will be done before the end of August, but I am very happy with the progress and I think the wait will be worth it, as I am very happy with the piece at this point.

Friday, August 14, 2009

Black Fire

So I have settled on what I think will be the final title for my current piece in progress. The new title for “The Red Dress” is:

“Black Fire”

The only question is should it be “Black Fire”, “Blackfire”, or “BlackFire”?



Ursus Demens

Thursday, August 13, 2009

Killer Joe and Things

Last night I got a lot of work done on “The Red Dress”. The big thing that got done was I made a minor tweak to one of the transitions that was working OK, but was not quite there, I added just a little bit to it (just a single note actually) and now it works really well.

I also made a preliminary recording of it which I dumped onto my MP3 player. So the piece is pretty much complete with just minor details to work out.

There are two decisions left to make about the piece:

  • Which of two endings to use.
  • What should I title the piece as.
I am only about 80 percent happy with the current title of “The Red Dress” and the variation “Her Red Dress”. I would have to say that the piece owes some of its inspiration to such classic Jazz tunes as “So What” and “Killer Joe”, with perhaps a very small dash of “City of Glass” thrown in. So I am looking for a title to reflect its ancestry; a bit dark, a bit edgy late at night, give me another Scotch sort of title.









Tuesday, August 11, 2009

The Piano Part


Work on “The Red Dress” continued last night. just got a little done, mostly making small changes and corrections to the piano part. We will see how much I will get done tonight.


Ursus Demens

Monday, August 10, 2009

Weekend.



As predicted I got very little done “The Red” Dress” over the weekend, but I did get a little work done. The big thing though is I did install my Sibelius 6 upgrade on Sunday. So far it looks very nice and did seem to “clean up” “The Red” Dress” score making it cleaner. As for the upgrade its self it went very smoothly with none of the pain when I up graded to Sibelius 5.



Friday, August 07, 2009

A Fifth


Well was able to work on “The Red Dress” last night. Fourth day in a row, but only a little work, but I am happy with the final “big” structure of the piece, so I am now just working on the details. But as the y say “the devil is in the details”. Some of my time was diverted to proofing the parts for “... and into dust you shall return”.


We will see if I can get a fifth day of work done, but since it is Friday the odds are not good.



Note: Lead sheet for “The Red Dress” is here , see page 2: N.J.S.G.

Thursday, August 06, 2009

Third Day



Got a third day of good work done on “The Red Dress” last night. Added a couple of bar to one of the transitions so the piece is now just a hair under 12 minutes in length. With all of the pieces in place now just need to fine tune all of the details and double check some voicings. There is one bar that I am not happy with need to do something with it. Hopefully I will be discipline and work it out tonight.

Wednesday, August 05, 2009

Two Days.

Continued working on “The Red Dress” last night, two days in a row that I have made good progress on it. All the major pieces are in place now. Only have the details to work on and finish. We will see if I can get a third day in a row of good work done.

Tuesday, August 04, 2009

Last Night

Got a good amount of work done on “Her Red Dress” last night. On track to make the end of August deadline.

“Her Red Dress” or “The Red Dress” or the “Lady in the Red Dress”. Need to decide on the final title.

Monday, August 03, 2009

By the End of Aug.

Setting a goal of finishing the big band version "Her Red Dress" by the end of August. Currently it is almost 12 minutes in lenght.


See page two, N.J.S.G.: Sharpe Curves

*